SPCC Rule Requirements for Diesel and Fuel Oil Storage

March 2, 2010

The Spill Prevention, Control, and Countermeasure (SPCC) rule in 40 CFR Part 112 is EPA’s federal standard for preventing oil discharges to navigable waters and adjoining shorelines. Non-transportation-related facilities that store diesel, fuel oil, or other oils above certain capacity thresholds must prepare a written SPCC plan, get it certified, implement it, and keep it current.

This is a general guide to current federal SPCC rule requirements. It is not legal advice and is not a substitute for the regulation or for advice from EPA or a qualified professional. Some states impose additional oil-storage rules, and some do not allow self-certification of SPCC plans.

Does the SPCC rule apply to your facility?

Under 40 CFR 112.1, the rule generally applies when the facility is non-transportation-related; stores, uses, or consumes oil or oil products; could reasonably be expected, because of its location, to discharge oil in harmful quantities into navigable waters or adjoining shorelines; and exceeds a storage-capacity threshold. Diesel and fuel oil count, as do other oils often stored on the same sites, such as lubricating, hydraulic, used, and transformer oils. Transportation-related operations generally fall under the U.S. Department of Transportation, not this rule.

The location determination must be based on geography—proximity to water, land contour, and drainage—and must ignore manmade features such as dikes that might contain a spill.

The capacity thresholds are:

  • Aggregate aboveground oil storage capacity of more than 1,320 U.S. gallons, counting only containers of 55 gallons or more; or
  • Completely buried oil storage capacity of more than 42,000 U.S. gallons.

Count each container’s shell capacity, not the volume in it on a given day. Containers smaller than 55 gallons, permanently closed containers, motive-power fuel tanks that serve only the vehicle they are mounted on, and certain other categories in 40 CFR 112.1(d) are left out of the aboveground total. Completely buried tanks fully subject to 40 CFR part 280, or an approved state underground-tank program under part 281, are generally excluded from the 42,000-gallon buried-capacity count and from the rule itself. Partially buried or bunkered tanks, and containers in vaults, count as aboveground storage. A facility at or below both thresholds (1,320 gallons aboveground or less, and 42,000 gallons countable buried or less) is below the federal capacity lines.

What an SPCC plan must include

A facility subject to the rule must prepare a written plan in accordance with good engineering practice and implement it. Management at a level that can commit the needed resources must approve it. If the facility is normally attended at least four hours a day, a complete copy must be kept on site; otherwise it may be kept at the nearest field office, and it must be available to EPA for on-site review during normal working hours.

Under 40 CFR 112.7, and the onshore petroleum provisions in 112.8, a typical plan addresses:

  • A facility diagram and an oil-container inventory (type of oil and storage capacity)
  • Discharge-prevention procedures for handling, loading, unloading, and transfers
  • Secondary containment or equivalent diversionary structures. For most bulk storage tanks, containment must hold the largest single container plus sufficient freeboard for precipitation, and diked areas must be sufficiently impervious
  • Inspections and integrity testing of aboveground containers on a regular schedule and after material repairs, using industry standards appropriate to the tank, with records kept with the plan for at least three years
  • Training for oil-handling personnel, a person accountable for discharge prevention, and discharge-prevention briefings at least once a year
  • Spill discovery, response, and cleanup procedures, including contacts such as the facility response coordinator and the National Response Center
  • Security and, where they apply, tank-truck loading and unloading controls

Who certifies the plan: Tier I, Tier II, and professional engineers

Unless a facility qualifies to self-certify, a licensed professional engineer must review and certify the plan, attesting that it was prepared in accordance with good engineering practice and the rule, that inspection and testing procedures have been established, and that the plan is adequate for the facility. Certification does not relieve the owner or operator of the duty to implement it.

A “qualified facility” may self-certify if it has 10,000 gallons or less of aggregate aboveground oil storage and, in the three years before the plan is certified (or since it became subject to the rule, if shorter), has not had a single discharge of more than 1,000 gallons to navigable waters or adjoining shorelines, or two discharges each of more than 42 gallons within any 12-month period. Discharges caused by natural disasters, acts of war, or terrorism are not counted. The gallon figures refer to oil that actually reaches the water or shoreline, not the total volume spilled.

  • Tier I qualified facilities also have no individual aboveground container larger than 5,000 gallons. They may complete and self-certify EPA’s plan template in Appendix G to 40 CFR part 112.
  • Tier II qualified facilities still meet the 10,000-gallon and discharge-history tests, but have at least one container larger than 5,000 gallons. They may self-certify a full plan under 40 CFR 112.7 and subparts B or C.

Self-certification is optional, and some states do not allow it. Check your state rules before relying on it.

Five-year reviews and plan amendments

The owner or operator must review and evaluate the SPCC plan at least once every five years, document that review, and sign a statement saying whether the plan will be amended. A required amendment must be prepared within six months of the review and implemented as soon as possible, but no later than six months after it is prepared.

The plan must also be amended when a change in facility design, construction, operation, or maintenance materially affects the potential for a discharge, such as adding, replacing, or moving tanks, or altering secondary containment. Those amendments have the same six-month windows. Technical amendments generally must be certified by a professional engineer, except as provided for qualified facilities in 40 CFR 112.6.

A short history of the SPCC compliance dates

EPA published a major SPCC amendment on July 17, 2002, effective August 16, 2002, and later extended the dates for amending or preparing and implementing plans under the revised rule. On June 19, 2009, EPA set that date at November 10, 2010. In October 2010, it extended the date to November 10, 2011 for most facilities. Offshore drilling, production, or workover facilities, and onshore facilities required to submit a Facility Response Plan, kept the November 10, 2010 date. Farms later received a further extension, to May 10, 2013.

Those deadlines have passed. A facility other than an oil production facility that begins operation after November 10, 2011 must prepare and implement its SPCC plan before operations begin. Oil production facilities that start after that date generally have six months after they begin operations.

Enforcement and penalties

EPA may inspect a facility and review its plan. Around the 2010 compliance dates, SPCC inspection and enforcement received increased attention. A plan on paper is not enough; it has to be implemented and kept current. The Clean Water Act authorizes civil penalties for oil-pollution and spill-prevention violations, and EPA adjusts those amounts periodically. This guide does not list dollar figures, because they change.

Under 40 CFR 112.4, a discharge of more than 1,000 gallons to navigable waters or adjoining shorelines, or two discharges each of more than 42 gallons within any 12-month period, requires a submittal of specified information to the EPA Regional Administrator within 60 days, with a copy to the state. Immediate reporting of a harmful oil discharge is a separate duty; the plan must include contacts for that purpose, including the National Response Center.

Fuel quality and tank care

SPCC plans are about keeping oil out of the water, but everyday tank and fuel condition still matters. Water, sediment, and microbial growth in stored diesel can foul equipment and can contribute to corrosion or other tank problems that inspections and integrity testing are meant to catch. Periodic diesel fuel testing—with samples analyzed by ISO/IEC 17025-accredited laboratories—and tank cleaning or fuel polishing when fuel or tank condition calls for it are ordinary good-storage practices. They are not a substitute for an SPCC plan, and they do not determine whether the rule applies.

If you have questions about the condition of stored diesel, you can contact DR FUEL CLEAN INC. For questions about whether the SPCC rule applies to your site, or how to certify a plan, use EPA’s SPCC resources and your EPA regional office, and consult a qualified professional as needed.

This article is for general information only. It is not legal advice, an SPCC plan, or a determination that any particular facility is or is not subject to 40 CFR Part 112. Always check the current text of the rule, EPA guidance, and your state and EPA regional office.

Frequently asked questions

Who needs an SPCC plan?

A non-transportation-related facility that stores, uses, or consumes oil, including diesel or fuel oil, generally needs an SPCC plan if, because of its location, it could reasonably be expected to discharge oil to navigable waters or adjoining shorelines, and if it has more than 1,320 gallons of aggregate aboveground oil storage capacity (counting containers of 55 gallons or more) or more than 42,000 gallons of completely buried oil storage. Some containers and underground tanks are excluded from those totals. See 40 CFR 112.1.

Does an SPCC plan have to be certified by a professional engineer?

Most SPCC plans must be reviewed and certified by a licensed professional engineer. A qualified facility with 10,000 gallons or less of aboveground oil storage and a qualifying discharge history may self-certify instead. Tier I qualified facilities, which also have no individual aboveground container larger than 5,000 gallons, may use EPA’s Appendix G template. Tier II qualified facilities may self-certify a full plan. Some states do not allow self-certification, so check your state requirements.

How often must an SPCC plan be reviewed?

The owner or operator must review and evaluate the plan at least once every five years, document that review, and state whether the plan will be amended. If an amendment is required, it must be prepared within six months of the review and implemented no later than six months after it is prepared. The plan must also be amended when a facility change materially affects the potential for a discharge.

Do half-empty tanks and small drums count toward the 1,320-gallon threshold?

You count each container’s storage capacity, not the volume of oil in it at the time. Only containers with a capacity of 55 gallons or more are added to the aboveground total. Containers under 55 gallons are not counted. Permanently closed containers and certain other categories listed in 40 CFR 112.1(d) are also excluded.

What happened to the November 10, 2010 SPCC compliance date?

On June 19, 2009, EPA extended the date for facilities to amend or prepare and implement SPCC plans under the post-2002 rule revisions to November 10, 2010. In October 2010, EPA extended that date to November 10, 2011 for most facilities. Offshore drilling, production, or workover facilities, and onshore facilities required to submit a Facility Response Plan, kept the November 10, 2010 date. Farms later had until May 10, 2013. Those deadlines have passed. A facility other than an oil production facility that begins operation after November 10, 2011 must have a plan in place before operations begin.

Sources

Federal rule text and EPA pages checked on November 19, 2026 (Asia/Bangkok). The eCFR text of 40 CFR Part 112 was current as of November 13, 2026.

Share:
Comments